We make
details work
The excellence of each project developed is in the details.
Campo Pequeno|Rehabilitation
Under construction
Complete rehabilitation of an apartment located in Lisbon, with a focus on modernization and space reorganization.
Vila Raposa|Rehabilitation
Under construction
Complete rehabilitation of the Vila Raposa property, located in Alfarim, in the municipality of Sesimbra. The intervention at Vila Raposa stands out due to the need for a complete renovation of the interior, façades, roof, and other exterior areas of the house.
Neri|Rehabilitation
Under construction
Complete rehabilitation and extension of a multi-family building located in the heart of Lisbon, with a project that aims to preserve the original architecture of the building in harmony with the surrounding urban environment.
Travessa 51|Rehabilitation
Under construction
Complete rehabilitation of an apartment located in the center of Lisbon, focusing on modernization and space optimization.
Rogil|New Construction
Under construction
The construction of a single-family house, featuring a ground floor and mezzanine, is underway in the center of the Southwest Alentejo and Vicentine Coast Natural Park.
Estrela|Rehabilitation
Under construction
Complete rehabilitation of an apartment located in an emblematic area of Lisbon. With an architectural project of great detail, Estrela is a work that stands out for its attention to detail, with a special focus on finishes, carpentry and stonework.
Junqueira|Rehabilitation
Under construction
Complete rehabilitation and extension of a duplex apartment located in a historic area of Lisbon.
Beloura|Rehabilitation
Under construction
Complete renovation of an apartment located in Quinta da Beloura. The project includes the total transformation of the interior space and the improvement of the exterior areas.
Morais Soares|Rehabilitation
Under construction
Complete renovation of an apartment with outdoor space located in Arroios.
Quelhas|Rehabilitation
Under construction
Complete refurbishment of a two-bedroom apartment including associated civil construction work, namely demolition, insertion of false ceilings in areas necessary for the passage of infrastructures of the various specialties, alteration of wall coverings and wooden flooring, general painting, new window frames, carpentry, change of sanitary ware, taps, glass screens and mirrors. Installation of new electrical and ited networks, new water and sewage networks, gas, new air conditioning and ventilation system.
VDL 862|Rehabilitation
Under construction
Complete rehabilitation of a house with an outdoor pool, located in Vale do Lobo.
AP Arroios|Rehabilitation
Under construction
Complete refurbishment of an apartment, including associated civil construction work, including demolition, false ceilings, partition walls, changes to wall and floor coverings, painting, new window frames, carpentry, changes to sanitary ware, taps, glass screens and mirrors. Installation of new networks.
VA Apartment|Rehabilitation
Under construction
Complete refurbishment of an apartment, including associated civil construction work, namely demolition and the installation of new water and sewage systems, painting, false ceilings, carpentry and the application of new coverings.
Alvalade Square|Rehabilitation
Under construction
Complete refurbishment of a five-bedroom apartment with a total area of 250m2, including associated civil construction work, namely demolition, false ceilings, partition walls, changes to wall and floor coverings, painting, new window frames, carpentry, changes to sanitary ware, taps, glass screens and mirrors. Installation of new networks.
Arroios|Rehabilitation
Under construction
Complete refurbishment of an apartment with an outdoor patio, including associated civil construction work, namely demolition, false ceilings, partition walls, changes to wall and floor coverings, painting, new window frames, carpentry, changes to sanitary ware, taps, glass screens and mirrors. Installation of new electricity and electricity networks, new water and sewage networks.
Alcochete|Rehabilitation
Under construction
Complete rehabilitation of a building consisting of ground floor, first floor and attic in the Historic Centre of Alcochete, including associated stability works, namely reinforced concrete structure, metallic structure and wooden structure. Includes construction works, namely demolition, alteration of wall, ceiling and floor coverings, painting, carpentry, locksmith work, change of sanitary ware and taps, glass screens and mirrors. Intervention in facades, coverings and window frames. Execution of new electrical and ited networks, new water and sewage networks, new air conditioning and ventilation system, and new gas network.
São Bento|Rehabilitation
Under construction
Complete rehabilitation of a building for residential and commercial use, with a total gross construction area of about 618 square meters. The contract includes partial alteration work inside the building (floors 0 to 3) and expansion work on the attic floor, with a total of 5 residential units distributed over the 4 floors and the attic floor, and a commercial area on the ground floor. The scope of work to be carried out includes significant demolition, structural reinforcement, various civil construction works, plasterboard work on walls and ceilings, alterations to wall and floor coverings, new carpentry, metalwork, and window and door frames, assembly of new equipment, and full execution of new special installation networks. It also includes the installation of an elevator in the building’s vertical communication core, thus promoting an improvement in the quality of the building’s use. There are also plans for work associated with the execution of a new roof and façade intervention, maintaining the existing architectural elements and restoring them.
Jordão|Rehabilitation
Under construction
Comprehensive rehabilitation of building including structural reinforcement, roof and facade work, associated civil construction work, namely demolition, partitions and false ceilings, execution of new wall and floor coverings, painting, window and door frames, carpentry, installation of sanitary ware, taps, glass and mirror covers. Execution of new networks of special installations.
Simple Vilamoura|New construction
Under construction
Development of a set of 5 villas including excavation and earthmoving works, execution of reinforced concrete structure, interior and exterior finishings, special installations, swimming pools and exterior arrangements.
Varandas do Bonfim|New construction
To be started
Construction of a building with development in height and basement parking, with a gross construction area of about 6500 square meters, for housing, with a total of 30 apartments. The contract includes peripheral containment and excavation works, construction of the reinforced concrete structure, interior and exterior finishings, façades and roofs, technical installations and exterior arrangements.
Forte 9|New construction
To be started
Development of the alteration project of a building composed by three basements, first floor and two high floors, with a gross construction area of about 8200 square meters, destined to offices. The works associated to the integral transformation of the building aim at a deep alteration of the building, keeping, in a generic way, its structure and basement floors and promoting the complete demolition of the façades. Demolition works, adaptation of the reinforced concrete and metallic structure, interior finishing works, the integral development of new technical installations, highlight works on the façades, and exterior arrangements of the lot where it is located will be carried out in compliance with the existing project.
Jaguiar|Rehabilitation
Concluded
Complete rehabilitation of an apartment in the center of Lisbon.
See the completed project here.
Pinheiro Chagas|Rehabilitation
Concluded
Complete rehabilitation of an apartment in the center of Lisbon.
See the completed project here.
Carlos Mardel Esq|Rehabilitation
Concluded
Complete rehabilitation of an apartment in the Arroios area, Lisbon.
See the completed project here.
Alcântara 67|Rehabilitation
Concluded
Total refurbishment of a 2-storey apartment with outdoor patio, with a total area of 300 m2. Small demolitions of masonry in the interior for the configuration of a bedroom with suite and adjustments to better-served areas at the social level and entrance to the house. The pine wood flooring is preserved on the whole of floor 1. The work includes replacing window frames, new coverings in sanitary installation areas and crockery, painting, carpentry, particularly in the kitchen, closets, doors and shutters. There is a decorative language on the walls and new ceilings with friezes. Electrical networks, new water and sewage networks and air conditioning have been installed. The exterior fittings essentially consist of total resurfacing with Algarvian terracotta tiles, a mezzanine with an extension to the existing balcony and a masonry tank.
See the finished project here.
Praça de Londres|Rehabilitation
Concluded
Complete rehabilitation of an apartment, including associated civil construction work, including demolition, false ceilings, changes to wall and floor coverings, painting, window frames, carpentry, changing sanitary ware, taps, glass screens and mirrors. Installation of new electrical and IT networks, new water and sewage networks, new air conditioning and ventilation systems.
See the finished project here.
Gonçalves Crespo 33|Rehabilitation
Concluded
Complete refurbishment of an apartment, including associated civil construction work, namely: small demolitions in the kitchen area necessary for the optimization and functionality of the space with lacquered finish carpentry, replacement of the water and sewage networks, as well as electricity and ited adapted to the new layout; insertion of an air conditioning system, recovery of the existing pine parquet flooring, different finishes and general painting.
See the finished project here.
Sacadura Cabral|Rehabilitation
Concluded
Complete rehabilitation of the apartment including associated civil construction works, namely demolition, false ceilings, alteration of wall and floor coverings, painting, window frames, carpentry, change of sanitary ware, faucets, glass screens and mirrors. Execution of new electrical and ited networks, new water and sewage networks, new air conditioning and ventilation system.
See the finished project here.
João Crisóstomo|Rehabilitation
Concluded
Complete rehabilitation of the apartment, including associated civil construction works, namely demolition, false ceilings, partition walls, alteration of wall and floor coverings, painting, new window frames, carpentry, change of sanitary ware, faucets, glass screens and mirrors. Execution of new installation networks.
See the finished project here.
Alvalade|Rehabilitation
Concluded
Complete rehabilitation of an apartment, including associated civil construction works, namely demolition, false ceilings, partition walls, change of wall and floor coverings, painting, new window frames, carpentry, change of sanitary ware, faucets, glass screens and mirrors. Execution of new installation networks.
See the finished project here.
Amoreiras 11|Rehabilitation
Concluded
Complete rehabilitation of the apartment, including associated civil construction works, namely demolition, false ceilings, change of wall and floor coverings, painting, carpentry, change of sanitary ware, taps, glass and mirror covers. Execution of new electrical and ited networks, new water, sewage, and central heating networks, gas, and new air conditioning and ventilation system.
See the finished project here.
São Miguel|Rehabilitation
Concluded
Complete rehabilitation of attic including associated civil construction works, namely demolition, false ceilings, change of wall and floor coverings, painting, carpentry, change of sanitary ware and taps. Execution of new electrical network, new water and sewage networks.
See the finished project here.
Vilamoura|Rehabilitation
Concluded
Alteration and expansion of a 200 m2 single-family house with swimming pool, inserted in a 2000m2 plot. The intervention foresaw the structural reinforcement in the part of the building to be kept and the execution of a structure in the expansion area. Thermal plaster with spatulated finish was applied on exterior walls and spatulated plaster with decorative mortar was applied on interior walls, as well as continuous coating on interior floors, exterior sidewalk and sanitary installations. The work also included the execution of the entire garden area, with the inclusion of several outdoor spaces.
Amoreiras|Rehabilitation
Concluded
Complete rehabilitation of the apartment, including associated civil construction works, namely demolition, false ceilings, change of wall and floor coverings, painting, carpentry, change of sanitary ware, faucets, glass screens and mirrors. Execution of new electrical and ited networks, new water and sewage networks, new air conditioning and ventilation system. Execution of exterior terrace arrangements.
See the finished project here.
Joaquim António Aguiar|Rehabilitation
Concluded
Complete rehabilitation of apartment, including associated civil construction works, namely demolition, false ceilings, change of wall and floor coverings, painting, new window frames, carpentry, change of sanitary ware, faucets, glass screens and mirrors. Execution of new electrical and ited networks, new water and sewage networks, gas, new air conditioning and ventilation system.
See the finished project here.
Gonçalves Crespo|Rehabilitation
Concluded
Complete rehabilitation of an apartment, including associated civil construction works, namely demolition, false ceilings, change of wall and floor coverings, painting, new window frames, carpentry, change of sanitary ware, faucets, glass screens and mirrors. Execution of new installation networks.
See the finished project here.
Carlos Mardel|Rehabilitation
Concluded
Rehabilitation and conservation of apartment, including associated civil construction works, namely false walls and ceilings in plasterboard, change of floor and paintings.
See the finished project here.